Short answer:once design and approvals are complete, an outdoor concrete pool typically takes 8–14 weeks to build and an indoor or basement pool 14–22 weeks. Allow extra time before that for survey, design and any planning, so a garden pool that should be ready for summer usually needs to start in the autumn or winter before.
Key takeaways

Outdoor pools: typically 8–14 weeks on site.
Indoor and basement pools: typically 14–22 weeks on site, because the room, ventilation and structure add work.
Design, quotations and approvals often take as long as the build itself.
Weather, access, ground conditions and late design changes are the main causes of delay.
To swim by June, aim to finalise design in winter.
A typical outdoor pool build, stage by stage
The ranges below are typical, not guaranteed; every site is different.
Weeks 1–2:setting out, excavation and spoil removal.
Weeks 2–4:base, steel reinforcement and pipework.
Weeks 4–6:concrete shell and curing.
Weeks 6–8:waterproofing and the 72-hour water test.
Weeks 8–12:tiling, coping, paving and plant room fit-out.
Final weeks:filling, balancing the water, commissioning and handover.
Why indoor and basement pools take longer
An indoor pool is a room as well as a pool. The structure, insulation, glazing, air handling, heating and electrics all have to be built and coordinated around the pool. Basement pools add excavation under or beside the house, temporary works and BS 8102 waterproofing, which is why we plan for 14–22 weeks on site.

What happens before the build starts
Survey and brief:access, ground conditions, services and what you want from the pool.
Design and quotation:layout, edge detail, finishes, plant and a fixed scope to price.
Approvals:a Lawful Development Certificate or planning application if needed, building regulations for any pool building, and party wall notices where excavation is near a neighbour.
Booking the programme:the build slot, materials and any long-lead items such as covers or glazing.
What causes delays
Prolonged wet weather during excavation and concrete work.
Unexpected ground conditions or groundwater.
Difficult access that slows spoil removal and deliveries.
Design changes after the shell is formed.
A failed water test, which is why we test before tiling.

When to start for summer
If you want to swim in early summer, the comfortable route is to settle the design in winter and start on site in early spring. Leaving the first conversation until May usually means a late-summer finish. Every date depends on survey and approvals.
Timescales by pool type
Outdoor liner pool: usually the quickest to build once approvals are in place.
Outdoor reinforced concrete pool: typically 8–14 weeks on site.
Indoor pool in a new pool hall: longer, because the building, ventilation and dehumidification are built alongside the pool.
Basement pool: pool work in an existing basement shell typically takes four to six months; digging the basement adds to that.
Approvals and their timescales
If a planning application is needed, allow for the council's decision period, usually eight weeks for a householder application, and longer if amendments are needed. A Lawful Development Certificate also takes time to issue, and Party Wall notices have their own notice periods, so serve them early.
How the weather affects a build
Rain slows excavation and can flood an open hole, frost can stop concreting and some waterproofing, and very wet ground makes access harder. A good programme allows for weather, and winter is often used for design and approvals rather than digging.
How to keep your project on time
Fix the design and specification before work starts.
Choose tiles, coping, lighting and cover early, so long-lead items arrive on time.
Agree access, parking and deliveries with neighbours in advance.
Respond quickly to questions from the site team.
Keep variations to a minimum once the shell is built.
What happens after handover
The first weeks after filling are a settling-in period: the water chemistry stabilises, the heating brings the pool up to temperature and you get used to the controls. A first service visit, usually within the first season, checks everything is working as it should.
Indoor pool programmes in more detail
An indoor pool hall adds the building itself: foundations, walls, roof, glazing, insulation and vapour control, plus ducted air handling. These trades overlap with the pool build, so a coordinated programme is essential. The pool is usually filled and commissioned only once the hall is weathertight and the air handling is running.
Booking your build slot
Spring and early summer are the most popular times to start, so build slots fill early. Booking in autumn or winter, with design and approvals complete, gives you the best choice of dates.
Keeping in touch during the build
Regular site updates with photographs, a named site manager and a clear process for decisions keep a build on schedule and make it easy to follow progress, even if you are away.
Frequently asked questions
How long does it take to build an inground pool in the UK?
For a reinforced concrete outdoor pool, typically 8–14 weeks on site after design and approvals are complete. Liner pools can be quicker, and indoor or basement pools take longer, typically 14–22 weeks.
Can you build a swimming pool in winter?
Yes. Excavation, steelwork and much of the structure can go ahead in winter, although frost and heavy rain can pause concrete and tiling work. Building over winter is often the best way to be swimming by summer.
How long does a basement pool take to build?
Typically 14–22 weeks on site for the pool, room and services, after design and approvals. The excavation and structural work around the house set the pace, so programmes vary more than for garden pools.
What is the biggest cause of pool build delays?
Late design changes and weather are the most common. Fixing the design, finishes and plant before work starts, and allowing some float in the programme for rain, keeps most builds on track.
Can a pool be built in winter?
Some stages can, but frost, heavy rain and short days slow excavation, concreting and waterproofing. Many owners use winter for design and approvals and start on site in early spring, ready for summer.
Sources and references
Talk to us about your pool
See ourswimming pool installation page. Book a free consultation, or email photographs and dimensions of your space toinfo@swimmingpoolcompany.co.ukfor an initial assessment.
Book a free consultation with The Swimming Pool Company London
The Swimming Pool Company has designed and built bespoke reinforced concrete pools across London and the South East since 2011. More than 50 London families now swim in pools we've built, and every one is backed by a 10-year structural guarantee.
If you're thinking about a pool, start with a free consultation. Send us a few photos of your garden and its rough dimensions, and we'll talk you through what's possible, what to check first and how to turn your idea into your dream pool and dream design.
Call: 0208 058 0871
Email: info@swimmingpoolcompany.co.uk
Visit: 87 Notting Hill Gate, London W11 3JZ
Book your free consultation
If you are still at the planning stage, speak to a specialist swimming pool company in London before you dig. The decisions made now are the ones that are hardest to change later.
Published on 14 November 2026 by The Swimming Pool Company.